OSDN Git Service

sched/fair: Add util_est on top of PELT
authorPatrick Bellasi <patrick.bellasi@arm.com>
Fri, 9 Mar 2018 09:52:42 +0000 (09:52 +0000)
committerIngo Molnar <mingo@kernel.org>
Tue, 20 Mar 2018 07:11:06 +0000 (08:11 +0100)
commit7f65ea42eb00bc902f1c37a71e984e4f4064cfa9
tree67b6425dc2cf32268acfe36e7324bb583579326f
parent10c18c44a6494167e7a7ca3a3a61a67972017bdf
sched/fair: Add util_est on top of PELT

The util_avg signal computed by PELT is too variable for some use-cases.
For example, a big task waking up after a long sleep period will have its
utilization almost completely decayed. This introduces some latency before
schedutil will be able to pick the best frequency to run a task.

The same issue can affect task placement. Indeed, since the task
utilization is already decayed at wakeup, when the task is enqueued in a
CPU, this can result in a CPU running a big task as being temporarily
represented as being almost empty. This leads to a race condition where
other tasks can be potentially allocated on a CPU which just started to run
a big task which slept for a relatively long period.

Moreover, the PELT utilization of a task can be updated every [ms], thus
making it a continuously changing value for certain longer running
tasks. This means that the instantaneous PELT utilization of a RUNNING
task is not really meaningful to properly support scheduler decisions.

For all these reasons, a more stable signal can do a better job of
representing the expected/estimated utilization of a task/cfs_rq.
Such a signal can be easily created on top of PELT by still using it as
an estimator which produces values to be aggregated on meaningful
events.

This patch adds a simple implementation of util_est, a new signal built on
top of PELT's util_avg where:

    util_est(task) = max(task::util_avg, f(task::util_avg@dequeue))

This allows to remember how big a task has been reported by PELT in its
previous activations via f(task::util_avg@dequeue), which is the new
_task_util_est(struct task_struct*) function added by this patch.

If a task should change its behavior and it runs longer in a new
activation, after a certain time its util_est will just track the
original PELT signal (i.e. task::util_avg).

The estimated utilization of cfs_rq is defined only for root ones.
That's because the only sensible consumer of this signal are the
scheduler and schedutil when looking for the overall CPU utilization
due to FAIR tasks.

For this reason, the estimated utilization of a root cfs_rq is simply
defined as:

    util_est(cfs_rq) = max(cfs_rq::util_avg, cfs_rq::util_est::enqueued)

where:

    cfs_rq::util_est::enqueued = sum(_task_util_est(task))
                                 for each RUNNABLE task on that root cfs_rq

It's worth noting that the estimated utilization is tracked only for
objects of interests, specifically:

 - Tasks: to better support tasks placement decisions
 - root cfs_rqs: to better support both tasks placement decisions as
                 well as frequencies selection

Signed-off-by: Patrick Bellasi <patrick.bellasi@arm.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Reviewed-by: Dietmar Eggemann <dietmar.eggemann@arm.com>
Cc: Joel Fernandes <joelaf@google.com>
Cc: Juri Lelli <juri.lelli@redhat.com>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Morten Rasmussen <morten.rasmussen@arm.com>
Cc: Paul Turner <pjt@google.com>
Cc: Rafael J . Wysocki <rafael.j.wysocki@intel.com>
Cc: Steve Muckle <smuckle@google.com>
Cc: Thomas Gleixner <tglx@linutronix.de>
Cc: Todd Kjos <tkjos@android.com>
Cc: Vincent Guittot <vincent.guittot@linaro.org>
Cc: Viresh Kumar <viresh.kumar@linaro.org>
Link: http://lkml.kernel.org/r/20180309095245.11071-2-patrick.bellasi@arm.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
include/linux/sched.h
kernel/sched/debug.c
kernel/sched/fair.c
kernel/sched/features.h